Client

City of Hillsboro, Washington County, & Pahlisch Homes

Location

Hillsboro, Oregon

SE Cornelius Pass Road Over Butternut Creek: Bridging the North and South

As South Hillsboro’s new Reed’s Crossing and Butternut Creek developments took shape, the area lacked adequate north-south connectivity for residents traveling to schools, shopping, and the broader Hillsboro area. AKS designed a new bridge carrying SE Cornelius Pass Road over Butternut Creek, providing the missing link between two growing neighborhoods while navigating tight budget constraints, sensitive environmental conditions, and a complex permitting landscape.

Problem

A Gap in the Grid

With only two north-south routes serving the rapidly growing South Hillsboro area, residents faced inefficient travel patterns across a disconnected street network. Butternut Creek physically separated the Reed’s Crossing and Butternut Creek PUD communities, and no crossing existed along SE Cornelius Pass Road to connect them. Beyond mobility, the gap also limited utility infrastructure, preventing the City of Hillsboro from extending water, sewer, and other services.

Solution

One Span, Many Functions: Economy, Utility, and Environmental Care

AKS evaluated four bridge design alternatives, weighing span length, structural materials, and construction cost before determining that a single-span concrete structure offered the best balance of economy and performance. The bridge was designed to carry a full suite of utilities across the creek, including an 18-inch water line, a 12-inch sanitary sewer line, gas lines, power conduits, and communication lines for multiple providers. When the hanging sewer main created both a code challenge and a public safety concern, AKS collaborated with Hillsboro Parks & Recreation to transform the required support structure into a dedicated pedestrian bridge, adding trail connectivity between two regional paths on either side of the creek.

Butternut Creek supports occurrences of threatened Upper Willamette River Winter Steelhead and is designated as an Essential Salmonid Habitat. Because this was a new crossing rather than a replacement, standard ESA programmatic coverage was unavailable, requiring consultation between the US Army Corps of Engineers and the National Marine Fisheries Service. AKS’ natural resources team prepared a Biological Assessment addressing potential impacts, proactively coordinating with state and federal agencies throughout the process to minimize environmental impacts and keep the project on track.

Result

A Crossing That Delivers

The completed SE Cornelius Pass Road Bridge delivered South Hillsboro’s third north-south connection, easing traffic loading and simplifying travel for residents of both communities. The 18-inch water main eliminated the City’s dependence on Tualatin Valley Water District for service south of the creek, while the sanitary sewer connection set the stage for future expansion of Reed’s Crossing and surrounding areas. What began as a straightforward transportation gap became an opportunity to strengthen infrastructure, protect habitat, and expand community connectivity for years to come.

Client

City of Hillsboro, Washington County, & Pahlisch Homes

Project Location

Hillsboro, Oregon

Services

Related Projects