Mill Creek A to Z Stewardship Project: A New Model for Forest Health

The Mill Creek A to Z Stewardship project is a groundbreaking initiative that’s reshaping how forest setting projects are funded. First launched as a pilot project by the US Forest Service, the A to Z stewardship model demonstrates how targeted work can generate the funding needed to achieve meaningful environmental outcomes without relying solely on federal appropriations. AKS partnered with Northwest Management and Vaagen Brothers to help bring this innovative approach to life across 54,000 acres in the Colville National Forest, providing environmental assessment support, surveying, engineering design, and construction management services throughout the multi-year project.

Problem

A Forest in Need of a New Approach

The project sites faced interconnected challenges: degraded fish passage, elevated fire risk, compromised water quality, and stressed wildlife habitats. Additionally, stream habitat had been diminished, and the road network needed realignment and restoration.

Solution

From Review to Reality

AKS’ foresters peer-reviewed harvest system designs and environmental assessments, and drafted sections on new road construction, reconstruction, maintenance, decommissioning, rock borrow pit analysis, and AOP analyses. From there, the team moved into implementation, which involved providing topographic surveying across 1,200 feet of stream realignment and 16 culvert sites, designing the replacement of 16 AOP structures, and developing a habitat restoration plan for stream realignment. Three culverts identified as fish passage barriers were removed, and more than a mile of mainline road was realigned.

Result

From Pilot to Proof: Results That Speak for Themselves

By 2023, all 16 culvert replacements had been fully installed, restoring approximately 1,200 feet of fish-bearing stream habitat and removing barriers to the passage of aquatic organisms throughout the project area. The completed work enhances water quality, reduces wildfire risk, and protects critical habitats. The A to Z stewardship framework itself stands as a replicable model for forest restoration funding. Building on this success, AKS is now in early design phases for 13 additional AOP structures in another forest region for Vaagen Brothers.