SE 129th Avenue/Mt. Scott Creek Culvert Replacement

HAPPY VALLEY, OR

AKS provided design and construction services for the replacement of two existing culverts over Mt. Scott Creek. The design featured the installation of a precast concrete bridge. The structure was designed according to Oregon Department of Fish & Wildlife requirements to facilitate migratory fish passage and was designed for a 100-year storm event. AKS worked with environmental subconsultant toassist with wetland delineation, alternatives analysis, natural resource assessment, and permitting. A joint US Army Corps of Engineers/Division of State Lands permit was prepared for impacts to the wetlands and creek. AKS managed the project from initial feasibility through design and permitting, and provided construction support.

AKS Services:

Stream & wetland enhancement
Culvert & bridge hydraulics
Stormwater modeling
Stormwater facilities design
Alternatives analysis
Engineering calculations
Grading & erosion control design
Construction drawings & specifications
Cost estimating
Construction staking
Construction permit processing
Contract administration
Construction support
As-built/record drawings